Work at Shimano Singapore

Digital Technology / Data Analysis Intern, June to December 2026

Seven projects, ordered for the reader you choose. Each one records how far it got, because a system that was built and a system that was used are different claims. Project descriptions use sample data and generalised operational details. Internal names, proprietary records and sensitive implementation details are omitted.

I owned the problem framing, experiment design, validation approach and the decisions behind what was kept, changed or rejected.

Ordered for
Change the reader to reorder the projects and change the detail shown on each card.
Validated and handed overJun to Jul 2026

Tool-life prediction for CNC lathes

Tested whether machine logs could time tool changes better than a piece counter.

MethodValidation used cycle-grouped splits over 5 and 20 seeds, a time-based split, walk-forward folds and leave-one-machine-out.

Product decisionEach tool receives a risk band (low, watch, medium, high), and every warning is advisory. The system never changes or extends a tool on its own.

−26%per-tool error on remaining life
Analysis and recommendationJul to Aug 2026

Shipment and order forecasting

Audited an existing forecast, then built and backtested a simpler one.

MethodI audited the existing forecasting pipeline first and identified target-definition and evaluation issues that prevented a fair benchmark. I rebuilt the evaluation with time-respecting backtests.

Product decisionEach result was delivered as one self-contained HTML page with the figures, charts and caveats together, so the planners could open it in a browser without running any code.

Rollingmulti-year rolling-origin backtest
Delivered, scheduled dailyAug 2026

SharePoint to Microsoft Fabric file sync

Automated a recurring SharePoint-to-Fabric ingestion workflow.

MethodThe first integration approach could not reliably transfer file payloads. A control test isolated the limitation, so I changed the architecture.

Scheduledmanual flow replaced by one scheduled copy job
Reached QA and a team trialSep 2026

Technical support assistant

Answers after-sales questions in plain language and cites its source.

MethodRetrieval combines BM25 keyword matching with Qdrant vector search, merged by reciprocal rank fusion. Exact model codes receive extra weight.

Product decisionTyping / lists the questions the assistant can answer, so its scope is visible rather than guessed. I also cut the first-run guide from 329 words to five short slides.

0.1 sfor a repeated question, down from 15.3 s
Reached the QA serverJul to Aug 2026

Safety documentation assistant

Drafts a hazard analysis from two photographs and a one-line note.

MethodTwo vision calls run in sequence: the first drafts a structured cause analysis and the second converts it into an editable grid. The schema requires every category.

Product decisionEvery field has a character counter sized to the cell it lands in, so text that fits on screen also fits in the workbook.

≈2 slongest request, down from 107.6 s
Reached the QA serverAug 2026

Engineering drawing reader

Reads tolerance values from scanned drawings for a person to confirm.

MethodThe model reports only what it sees and where. Plain Python assigns each value to its point, so a top and bottom swap cannot happen.

Product decisionA user's confusion over tab counts led me to redesign the drawing-review flow.

All matchedvalues matched in a held-out internal test set
Built and verifiedSep 2026

Sales, purchase and inventory planning app

Rebuilds a planning workbook's figures as a web application.

MethodRecomputed tens of thousands of monthly planning values from underlying order data and matched the existing workbook across every review group tested.

Product decisionThresholds set by the planner are labelled apart from thresholds set by the app, so it is always clear whose number is whose.

Verifiedworkbook parity across all review groups